Every data center project ends the same way: the hardware has to move.
Build out, consolidate, relocate, or tear down — the physical layer is the same problem. High-value, ESD-sensitive equipment that has to move on a hard date without a scratch and without losing the chain of custody. That layer is the only thing AB&M does. One call. It moves.
📞 803-244-9897Whether you’re building out, consolidating, relocating, or tearing down, the physical layer is the same problem — high-value, ESD-sensitive equipment that has to move on a hard date without a scratch and without losing the chain of custody. That layer is the only thing AB&M does, and we do it across the full data center lifecycle.
AB&M built and runs the dedicated server logistics program for one of the world’s largest hyperscale data center buildouts. ESD-compliant transport aligned to ANSI/ESD S20.20, custody documented at four control points, zero cargo theft for nearly three decades, dispatched 24/7 by a real dispatcher — never a public load board. Ground expedite is the workhorse across the US, Canada, and Mexico; hand carry handles the single moves too sensitive to ride freight; air forwarding backs the longest hauls.
By Robert McGrady, General Manager · 16 years OTR. 18 years expedite brokering. Decade+ at AB&M. · Published June 3, 2026 · Updated June 3, 2026.
Where your project sits
Data center relocation
Live migration, lift-and-shift, consolidation, edge deployment, GPU/AI hardware freight.
Data center decommissioning logistics
Moving decommissioned servers and racks out under documented custody.
Data center migration
The freight side of a migration project.
Non-asset by design
We match the right equipment-rated carrier to your move instead of forcing your freight onto whatever truck we happen to own. Every move runs under documented chain of custody, dispatched 24/7. One call. It moves.
Moving data center hardware? Start with the dispatcher.
📞 (803) 244-9897or email ship@ab-mlogistics.com